This bathroom was completely stripped. Most of the walls and the ceiling were replastered. The shower was installed where the bath had been, the basin relocated across the room, the bath installed under the window, and the WC moved across the room. All the waste pipes had to be re-routed; with the WC this meant cutting through the wall and replacing a section of the waste stack. The water supply pipes were relaid, the shower being supplied by the combi boiler

Before with original WC, basin & bath position

Before new bath

After

Bath & divide

Behind the door

Detail of WC with hidden cistern etc